Single machine scheduling problem with controllable processing times and resource dependent release times
DOI10.1016/J.EJOR.2006.07.005zbMATH Open1131.90022OpenAlexW2050740443MaRDI QIDQ877039FDOQ877039
Suk-Hun Yoon, Sung-Jin Chung, Byung-Cheon Choi
Publication date: 19 April 2007
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2006.07.005
NP-completenesssingle machine schedulingpartition problemresource dependent release timecontrollable processing time
Deterministic scheduling theory in operations research (90B35) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20)
Cites Work
- Some comments on sequencing with controllable processing times
- Positive half-products and scheduling with controllable processing times
- A survey of results for sequencing problems with controllable processing times
- Single machine batch scheduling with resource dependent setup and processing times
- Single machine scheduling problem with a common deadline and resource dependent release dates
- Choosing the Job Sequence and Processing Times to Minimize Total Processing Plus Flow Cost on a Single Machine
- Single machine scheduling subject to deadlines and resource dependent processing times
- Single machine sequencing with linear models of release dates
- Single machine group scheduling with resource dependent setup and processing times
- Minimizing the total weighted flow time in a single machine with controllable processing times
- Convex resource allocation for minimizing the makespan in a single machine with job release dates
- Group scheduling with controllable setup and processing times: minimizing total weighted completion time
- Time-optimal control in a single machine problem with resource constraints
- Resource optimal control in some single-machine scheduling problems
- Single machine scheduling with resource dependent release times and processing times
- Title not available (Why is that?)
- Scheduling with resource-dependent release dates—a comparison of two different resource consumption functions
Cited In (7)
- Single machine scheduling with resource dependent release times and processing times
- A Time–Cost Tradeoff Problem with Multiple Assessments and Release Times on a Chain Precedence Graph
- Single‐machine scheduling problem with resource dependent release dates to minimise total resource‐consumption
- Scheduling with compressible and stochastic release dates
- Controllable processing times in project and production management: analysing the trade-off between processing times and the amount of resources
- Single machine scheduling with resource allocation and learning effect considering the rate-modifying activity
- Scheduling identical serial-batching machines in the engine manufacturing supply chain by an integrated variable neighborhood search Algorithm
Recommendations
- Single machine scheduling with resource dependent release times and processing times 👍 👎
- Single machine scheduling problems with resource dependent release times 👍 👎
- Single machine scheduling with controllable release and processing parameters 👍 👎
- On scheduling a single machine with resource dependent release times 👍 👎
- Single machine scheduling problems with resource dependent processing times 👍 👎
- Single-machine scheduling with time-and-resource-dependent processing times 👍 👎
- Title not available (Why is that?) 👍 👎
- Single‐machine scheduling problem with resource dependent release dates to minimise total resource‐consumption 👍 👎
- Single machine scheduling of unit-time jobs with controllable release dates 👍 👎
- Single machine scheduling with discretely controllable processing times 👍 👎
This page was built for publication: Single machine scheduling problem with controllable processing times and resource dependent release times
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q877039)