Simultaneous optimization of classical objectives in JIT scheduling
From MaRDI portal
Publication:879282
DOI10.1016/J.EJOR.2006.07.019zbMATH Open1128.90526OpenAlexW2015336135MaRDI QIDQ879282FDOQ879282
Authors: Vassilissa Lebacque, Vincent Jost, Nadia Brauner
Publication date: 11 May 2007
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2006.07.019
Recommendations
- Just-in-time scheduling. Models and algorithms for computer and manufacturing systems
- scientific article; zbMATH DE number 1537217
- Minimizing variation of production rates in just-in-time systems: A survey
- Multicriteria models for just-in-time scheduling
- Just-in-time sequencing algorithms for mixed-model production systems
Management decision making, including multiple objectives (90B50) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Minimizing variation of production rates in just-in-time systems: A survey
- A framework for the complexity of high-multiplicity scheduling problems
- Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems
- Level Schedules for Mixed-Model, Just-in-Time Processes
- The maximum deviation just-in-time scheduling problem.
- Note—Sequencing JIT Mixed-Model Assembly Lines
- A bicriterion objective for levelling the schedule of a mixed-model, \(JIT\) assembly process
- A Computational Analysis Of Balanced Jit Optimization Algorithms
- On The Relations Between Optimal Solutions For Different Types OfMin-SumBalanced Jit Optimisation Problems
Cited In (6)
- Title not available (Why is that?)
- Title not available (Why is that?)
- Solving symmetric mixed-model multi-level just-in-time scheduling problems
- The product rate variation problem and its relevance in real world mixed-model assembly lines
- The multi-objective assembly line worker integration and balancing problem of type-2
- Multicriteria models for just-in-time scheduling
This page was built for publication: Simultaneous optimization of classical objectives in JIT scheduling
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q879282)