Knowledge integration using problem spaces: A study in resource-constrained project scheduling
From MaRDI portal
Publication:880537
DOI10.1007/s10951-006-6776-xzbMath1154.90480MaRDI QIDQ880537
Publication date: 15 May 2007
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10951-006-6776-x
90B35: Deterministic scheduling theory in operations research
Related Items
Competence-driven project portfolio selection, scheduling and staff assignment, A survey of variants and extensions of the resource-constrained project scheduling problem, A practical and robust execution time-frame procedure for the multi-mode resource-constrained project scheduling problem with minimal and maximal time lags
Cites Work
- Unnamed Item
- Unnamed Item
- Connectionist approaches for solver selection in constrained project scheduling
- Randomized allocation with nonparametric estimation for a multi-armed bandit problem with covariates
- On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints
- Critical-Path Planning and Scheduling: Mathematical Basis
- Dual Algorithms for Pure Network Problems
- Multi-Project Scheduling: Categorization of Heuristic Rules Performance
- Project scheduling: The effects of problem structure on heuristic performance
- Heuristic scheduling of resource-constrained projects with cash flows
- An integer linear programming model and a modified branch and bound algorithm for the project material requirements planning problem
- Cash Flows in Networks
- The payment scheduling problem
- Maximizing the net present value of a project under resource constraints using a Lagrangian relaxation based heuristic with tight upper bounds
- Four payment models for the multi-mode resource constrained project scheduling problem with discounted cash flows