A mathematical programming model and solution for scheduling production orders in Shanghai Baoshan Iron and Steel Complex
From MaRDI portal
Publication:884075
DOI10.1016/j.ejor.2006.09.090zbMath1121.90333OpenAlexW2025254310MaRDI QIDQ884075
Publication date: 13 June 2007
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2006.09.090
Lagrangian relaxationcombinatorial optimizationsubgradient optimizationproduction order schedulingsteel production
Deterministic scheduling theory in operations research (90B35) Production models (90B30) Combinatorial optimization (90C27) Methods of reduced gradient type (90C52)
Related Items
Models for scheduling charges in continuous casting: application to a Brazilian steel plant ⋮ A soft-decision based two-layered scheduling approach for uncertain steelmaking-continuous casting process ⋮ Production scheduling in a market-driven foundry: a mathematical programming approach versus a project scheduling metaheuristic algorithm ⋮ A GRASP heuristic for slab scheduling at continuous casters ⋮ Multi-level lot sizing and job shop scheduling with compressible process times: a cutting plane approach
Cites Work
- Price-based planning and scheduling of multiproduct orders in symbiotic manufacturing networks
- Lagrangian heuristics for the two-echelon, single-source, capacitated facility location problem
- An alternative framework to Lagrangian relaxation approach for job shop scheduling.
- An improved stepsize of the subgradient algorithm for solving the Lagrangian relaxation problem
- Scheduling uncertain orders in the customer-subcontractor context
- A mixed integer programming model for scheduling orders in a steel mill
- A Lagrangean Relaxation Approach for Very-Large-Scale Capacitated Lot-Sizing
- Steel-making process scheduling using Lagrangian relaxation