Multi-objective genetic algorithm for single machine scheduling problem under fuzziness
DOI10.1007/S10700-007-9026-6zbMATH Open1140.90398OpenAlexW2043603883WikidataQ62309451 ScholiaQ62309451MaRDI QIDQ928186FDOQ928186
Alejandra Duenas, Dobrila Petrovic
Publication date: 11 June 2008
Published in: Fuzzy Optimization and Decision Making (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10700-007-9026-6
Recommendations
- Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms
- USING GENETIC ALGORITHMS TO SOLVE FUZZY FLOW SHOP SCHEDULING PROBLEMS BASED ON POSSIBILITY AND NECESSITY MEASURES
- AN EVOLUTIONARY ALGORITHM FOR PURE FUZZY FLOWSHOP SCHEDULING PROBLEMS
- scientific article; zbMATH DE number 1539052
- scientific article; zbMATH DE number 1539056
Multi-objective and goal programming (90C29) Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35) Fuzzy and other nonstochastic uncertainty mathematical programming (90C70)
Cites Work
- Title not available (Why is that?)
- On ordered weighted averaging aggregation operators in multicriteria decisionmaking
- Scheduling unit processing time jobs on a single machine with multiple criteria
- Title not available (Why is that?)
- Scheduling under fuzziness
- Generalized means as model of compensative connectives
- Title not available (Why is that?)
- A fuzzy-linguistic approach to a multi-criteria sequencing problem
- Single machine, scheduling problem with fuzzy precedence relation
- Title not available (Why is that?)
- Multicriteria scheduling using fuzzy theory and tabu search
- Path numbers of balanced bipartite tournaments
Cited In (7)
- Using genetic algorithms for single-machine bicriteria scheduling problems
- Multistage production distribution under uncertain demands with integrated discrete particle swarm optimization and extended priority-based hybrid genetic algorithm
- Survey on fuzzy shop scheduling
- A possibilistic approach to the modeling and resolution of uncertain closed-loop logistics
- Evolutionary tabu search for flexible due-date satisfaction in fuzzy job shop scheduling
- Setting due dates to minimize the total weighted possibilistic mean value of the weighted earliness-tardiness costs on a single machine
- Machine-tool selection and operation allocation in FMS: Solving a fuzzy goal-programming model using a genetic algorithm
This page was built for publication: Multi-objective genetic algorithm for single machine scheduling problem under fuzziness
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q928186)