Total completion time in a two-machine flowshop with deteriorating tasks
From MaRDI portal
(Redirected from Publication:928678)
Recommendations
- Minimizing total completion time in a two-machine flow shop with deteriorating jobs
- Bicriteria hierarchical optimization of two-machine flow shop scheduling problem with time-dependent deteriorating jobs
- Flow shop scheduling problems with deteriorating jobs under dominating machines
- Minimizing total weighted completion time in a two-machine flow shop scheduling under simple linear deterioration
- Two-machine flow shop total tardiness scheduling problem with deteriorating jobs
Cites work
- A variant of the permutation flow shop model with variable processing times
- Complexity analysis of job-shop scheduling with deteriorating jobs
- General Flowshop Models: Job Dependent Capacities, Job Overlapping and Deterioration
- General flow-shop scheduling with resource constraints
- Hierarchical Control Of The Two Processor Flow-Shop With State Dependent Processing Times: Complexity Analysis And Approximate Algorithms
- Minimization of resource consumption under a given deadline in the two- processor flow-shop scheduling problem
- Multi-Machine Scheduling With Linear Deterioration
- Optimal control of a class of DEDS: Flow-shops with state-dependent processing times
- Parallel machine scheduling with time dependent processing times
- Scheduling of a Two-machine Flowshop with Processing Time Linearly Dependent on Job Waiting-time
- Single machine scheduling with nonlinear cost functions
- The two-machine permutation flow shop with state-dependent processing times
- Λ-Shaped Policies to Schedule Deteriorating Jobs
Cited in
(2)
This page was built for publication: Total completion time in a two-machine flowshop with deteriorating tasks
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q928678)