A zero-inventory production and distribution problem with a fixed customer sequence
DOI10.1007/S10479-007-0272-3zbMATH Open1152.90301OpenAlexW2092411961MaRDI QIDQ940901FDOQ940901
Authors: B. E. Eshmatov
Publication date: 3 September 2008
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10479-007-0272-3
Recommendations
- scientific article; zbMATH DE number 617071
- The integrated production-inventory-distribution-routing problem
- A single-period inventory placement problem for a serial supply chain
- On inventory problems with arbitrary cost pattern, demand pattern and demand distribution
- Solutions of a class of discrete-time inventory problems
- scientific article; zbMATH DE number 2247879
- scientific article; zbMATH DE number 4170624
- A production-inventory problem with price-sensitive demand
- Optimization on production-inventory problem with multistage and varying demand
time windowsbranch and bound search procedureheuristic lower boundproduct lifespanzero-inventory production and distribution problem
Polyhedral combinatorics, branch-and-bound, branch-and-cut (90C57) Approximation methods and heuristics in mathematical programming (90C59) Inventory, storage, reservoirs (90B05)
Cites Work
- Single machine scheduling with batch deliveries
- The integrated production and transportation scheduling problem for a product with a short lifespan
- Title not available (Why is that?)
- Machine scheduling with transportation considerations
- Supply Chain Scheduling: Batching and Delivery
- Technical Note—Analysis of a Heuristic for One Machine Sequencing with Release Dates and Delivery Times
- Threshold accepting: A general purpose optimization algorithm appearing superior to simulated annealing
- Batch Delivery Scheduling on a Single Machine
- Single Machine Scheduling to Minimize Batch Delivery and Job Earliness Penalties
- A polynomial-time approximation scheme for single-machine sequencing with delivery times and sequence-independent batch set-up times
- A note on the complexity of single-machine scheduling with a common due date, earliness-tardiness, and batch delivery costs
- Solving the medium newspaper production/distribution problem
Cited In (18)
- Finding efficient make-to-order production and batch delivery schedules
- The mobile production vehicle routing problem: using 3D printing in last mile distribution
- Coordinated scheduling of production and delivery with production window and delivery capacity constraints
- Home chemotherapy delivery: an integrated production scheduling and multi-trip vehicle routing problem
- Integrated production and transportation scheduling with order-dependent inventory holding costs
- An improved memetic algorithm for integrated production scheduling and vehicle routing decisions
- A review on integrated scheduling and outbound vehicle routing problems
- A new heuristic scheduling method for the make-pack-route problem in make-to-order supply chains
- Mixed integer formulations for a coupled lot-scheduling and vehicle routing problem in furniture settings
- Integrated scheduling of production and distribution with release dates and capacitated deliveries
- Integrated production and distribution scheduling with lifespan constraints
- A decentralized production–distribution scheduling problem: Solution and analysis
- Optimization model for a production, inventory, distribution and routing problem in small furniture companies
- Supply chain batching problem with identical orders and lifespan
- An exact approach based on a new pseudo-polynomial network flow model for integrated planning and scheduling
- Hyper-heuristic for integrated due-window scheduling and vehicle routing problem for perishable products considering production quality
- Integrated production scheduling and delivery routing: complexity results and column generation
- Complexity results for an integrated single machine scheduling and outbound delivery problem with fixed sequence
Uses Software
This page was built for publication: A zero-inventory production and distribution problem with a fixed customer sequence
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q940901)