A note on ``the capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times
From MaRDI portal
Publication:941560
DOI10.1016/J.COR.2006.08.019zbMath1170.90384OpenAlexW2067095256MaRDI QIDQ941560
Bernardo Almada-Lobo, Maria Antónia Carravilla, José Fernando Oliveira
Publication date: 1 September 2008
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2006.08.019
Related Items (6)
Neighbourhood search meta-heuristics for capacitated lot-sizing with sequence-dependent setups ⋮ Lead time considerations for the multi-level capacitated lot-sizing problem ⋮ On production planning and scheduling in food processing industry:modelling non-triangular setups andproduct decay ⋮ Infeasibility handling in genetic algorithm using nested domains for production planning ⋮ A capacitated lot-sizing model with sequence-dependent setups, parallel machines and bi-part injection moulding ⋮ Profit maximization in simultaneous lot-sizing and scheduling problem
Uses Software
Cites Work
This page was built for publication: A note on ``the capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times