Improved hybrid simulated annealing algorithm for navigation scheduling for the two dams of the Three Gorges Project
From MaRDI portal
(Redirected from Publication:950037)
Recommendations
- Lockage scheduling of three gorges-gezhouba dams by hybrid of chaotic particle swarm optimization and heuristic-adjusted strategies
- Series queuing network scheduling approach to co-scheduling model of three Gorges-Gezhou dam
- Simulated annealing-based ant colony algorithm for tugboat scheduling optimization
- An Optimal Scheduling System for the Welland Canal
- scientific article; zbMATH DE number 500268
Cites work
- A global MILP model for FMS scheduling
- A hybrid genetic/optimization algorithm for a task allocation problem
- Local search genetic algorithms for the job shop scheduling problem
- Mathematical modelling and heuristic approaches to operation scheduling problems in an FMS environment
- Modelling and heuristics of FMS scheduling with multiple objectives
Cited in
(5)- Simulated annealing-based ant colony algorithm for tugboat scheduling optimization
- Two meta-heuristic algorithms for solving multi-objective flexible job-shop scheduling with parallel machine and maintenance constraints
- Coordinated optimized scheduling of locks and transshipment in inland waterway transportation using binary NSGA‐II
- Series queuing network scheduling approach to co-scheduling model of three Gorges-Gezhou dam
- Lockage scheduling of three gorges-gezhouba dams by hybrid of chaotic particle swarm optimization and heuristic-adjusted strategies
This page was built for publication: Improved hybrid simulated annealing algorithm for navigation scheduling for the two dams of the Three Gorges Project
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q950037)