Minimizing earliness and tardiness subject to total completion time in an identical parallel machine system
From MaRDI portal
Publication:954048
Recommendations
- Scheduling on parallel identical machines to minimize total tardiness
- Minimizing maximum earliness on parallel identical machines
- Parallel machine scheduling to minimize costs for earliness and number of tardy jobs
- Due-date assignment and early/tardy scheduling on identical parallel machines
- Minimizing makespan subject to minimum total flow-time on identical parallel machines
Cites work
- scientific article; zbMATH DE number 2146482 (Why is no real title available?)
- scientific article; zbMATH DE number 849179 (Why is no real title available?)
- Heuristics for Multimachine Scheduling Problems with Earliness and Tardiness Costs
- Makespan minimization subject to flowtime optimality on identical parallel machines
- Minimizing makespan subject to minimum flowtime on two identical parallel machines
- Minimizing makespan subject to minimum total flow-time on identical parallel machines
- Minimizing the sum of absolute lateness in single-machine and multimachine scheduling
- Parallel machine scheduling with a common due window
- Parallel-Machine Scheduling Problems with Earliness and Tardiness Penalties
- Scheduling under a common due-date on parallel unrelated machines
Cited in
(12)- Minimizing the sum of earliness/tardiness in identical parallel machines schedule with incompatible job families: An improved MIP approach
- A tabu search algorithm for a pipe-processing flowshop scheduling problem minimizing total tardiness in a shipyard
- Optimal policies for minimizing total job completion times and deviations from common due dates in unrelated parallel machine scheduling
- Bicriteria multi-machine scheduling with equal processing times subject to release dates
- Design of a genetic algorithm for bi-objective unrelated parallel machines scheduling with sequence-dependent setup times and precedence constraints
- Scheduling with earliness-tardiness penalties and parallel machines
- A mixed integer linear formulation for the open shop earliness-tardiness scheduling problem
- A moving block heuristic to minimise earliness and tardiness costs on parallel machines
- Minimizing the sum of job earliness and tardiness in a multimachine system
- An intelligent water drop algorithm to identical parallel machine scheduling with controllable processing times: a just-in-time approach
- Minimizing total tardiness and earliness on unrelated parallel machines with controllable processing times
- A multi-objective optimization for preemptive identical parallel machines scheduling problem
This page was built for publication: Minimizing earliness and tardiness subject to total completion time in an identical parallel machine system
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q954048)