Risk assessment method of major unsafe hydroelectric project
From MaRDI portal
Publication:954315
Recommendations
- Evaluation model for service life of dam based on time-varying risk probability
- Bayesian decision analysis of dam safety
- Incorporating inflow uncertainty into risk assessment for reservoir operation
- Major project risk assessment method based on BP neural network
- Method discussion on integrated risk analysis of flood disaster -- based on set pair
Cited in
(5)- Evaluation model for service life of dam based on time-varying risk probability
- Waterlogging hazard assessment of deep foundation pit projects based on FOWA operator and gray clustering
- Models and methods for the construction of risk maps for cultural heritage
- RECONSTRUCTION ANALYSIS OF THE COMPREHENSIVE EVALUATION OF SOCIAL-ECONOMICAL-ENVIRONMENTAL-ECOLOGICAL IMPACTS OF THE THREE GORGES PROJECT
- Dam overtopping risk assessment considering inspection program
This page was built for publication: Risk assessment method of major unsafe hydroelectric project
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q954315)