Imperfect reworking process consideration in integrated inventory model under permissible delay in payments
From MaRDI portal
Publication:955958
DOI10.1155/2008/386252zbMath1151.90315OpenAlexW1969252474WikidataQ58646172 ScholiaQ58646172MaRDI QIDQ955958
Publication date: 24 November 2008
Published in: Mathematical Problems in Engineering (Search for Journal in Brave)
Full work available at URL: https://eudml.org/doc/54837
Production theory, theory of the firm (91B38) Trade models (91B60) Inventory, storage, reservoirs (90B05)
Related Items (1)
Cites Work
- Unnamed Item
- Retailer's EOQ model with limited storage space under partially permissible delay in payments
- Economic lot scheduling problem with imperfect production processes
- Economic Order Quantity under Conditions of Permissible Delay in Payments
- Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction
- Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System
- An ordering policy for deteriorating items with allowable shortage and permissible delay in payment
- On the economic order quantity under conditions of permissible delay in payments
- Ordering Policies of Deteriorating Items under Permissible Delay in Payments
This page was built for publication: Imperfect reworking process consideration in integrated inventory model under permissible delay in payments