Utilizing an approximative solution to obtain the real optimal solution for a production and inspection model
From MaRDI portal
Publication:965532
DOI10.1016/J.APM.2008.12.014zbMATH Open1205.90113OpenAlexW1983793259MaRDI QIDQ965532FDOQ965532
Authors: Chih-Hsiung Wang, Ruey Huei Yeh
Publication date: 24 April 2010
Published in: Applied Mathematical Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.apm.2008.12.014
Recommendations
- Simultaneous determination of the optimal production-inventory and product inspection policies for a deteriorting production system
- scientific article; zbMATH DE number 7447420
- Optimal production run time for a deteriorating production system under an extended inspection policy
- Fast approach to the optimal production/PM policy
- Joint Determination of Production Cycle and Inspection Intervals in a Deteriorating Production System
Reliability, availability, maintenance, inspection in operations research (90B25) Production models (90B30)
Cites Work
- Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction
- Fast approach to the optimal production/PM policy
- Optimal production and maintenance policy for imperfect production systems
- Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System
- Simultaneous determination of the optimal production-inventory and product inspection policies for a deteriorting production system
- Economic off-line quality control strategy with two types of inspection errors
- Joint determination of production quantity, inspection schedule, and quality control for an imperfect process with deteriorating products
- Optimal production run length for products sold with warranty
- Optimal lot size and inspection policy for products sold with warranty
- Economic optimization of off-line inspection with inspection errors
- Optimal lot sizing for products sold under free-repair warranty.
- Lot sizing and testing for items with uncertain quality
Cited In (5)
- An efficient algorithm for maximizing the expected profit from a serial production line with inspection stations and rework
- The production tolerances influence on the optimal solution
- The effects of inspection delay and restoration cost on the optimal inspection and production policy
- Determining an optimal production run length with an extended quality control policy for an imperfect process
- A particle swarm algorithm for inspection optimization in serial multi-stage processes
This page was built for publication: Utilizing an approximative solution to obtain the real optimal solution for a production and inspection model
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q965532)