The economic lot scheduling problem under extended basic period and power-of-two policy
From MaRDI portal
Publication:968005
DOI10.1007/S11590-009-0154-5zbMATH Open1189.90067OpenAlexW2023261881MaRDI QIDQ968005FDOQ968005
Wikrom Jaruphongsa, Huei-Chuen Huang, Hainan Sun
Publication date: 3 May 2010
Published in: Optimization Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s11590-009-0154-5
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Title not available (Why is that?)
- The Economic Lot-Scheduling Problem: Achieving Feasibility Using Time-Varying Lot Sizes
- Computing Optimal Lot Sizes in the Economic Lot Scheduling Problem
- The Economic Lot Scheduling Problem (ELSP): Review and Extensions
- The economic lot scheduling problem under power-of-two policy
- A Dynamic Programming Approach to a Lot Size Scheduling Problem
- The economic lot scheduling problem: a pure genetic search approach
- Rounding Off to Powers of Two in Continuous Relaxations of Capacitated Lot Sizing Problems
- The G-group heuristic for single machine lot scheduling
- Two heuristics for the economic lot scheduling problem: An experimental study
Cited In (2)
This page was built for publication: The economic lot scheduling problem under extended basic period and power-of-two policy
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q968005)