A two-stage hybrid flowshop with uniform machines and setup times
From MaRDI portal
Publication:969780
DOI10.1016/S0895-7177(97)00258-6zbMATH Open1185.90078OpenAlexW1973996354MaRDI QIDQ969780FDOQ969780
Authors: Wanzhen Huang, Shanling Li
Publication date: 8 May 2010
Published in: Mathematical and Computer Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0895-7177(97)00258-6
Recommendations
- A hybrid two-stage flowshop with part family, batch production, major and minor set-ups
- Two-Stage, Hybrid Flowshop Scheduling Problem
- Group scheduling in a two-stage flowshop
- Scheduling a two-stage hybrid flow shop with parallel machines at the first stage
- Sequencing a hybrid two-stage flowshop with dedicated machines
Cites Work
- Title not available (Why is that?)
- Two-Stage, Hybrid Flowshop Scheduling Problem
- A hybrid two-stage flowshop with part family, batch production, major and minor set-ups
- Scheduling a two-stage hybrid flowshop with separable setup and removal times
- Title not available (Why is that?)
- Branch and bound algorithm for the flow shop with multiple processors
- Analysis of Classes of Heuristics for Scheduling a Two-Stage Flow Shop with Parallel Machines at One Stage
Cited In (13)
- A two-stage hybrid flowshop scheduling problem with a function constraint and unrelated alternative machines
- A case study on effect of grouping technique in a multi-stage hybrid flow shop
- Minimizing makespan in a two-stage hybrid flow shop scheduling problem with open shop in one stage
- A comprehensive review of flowshop group scheduling literature
- The hybrid flow shop scheduling problem
- Group technology in a hybrid flowshop environment: a case study
- A two-stage hybrid flow shop with dedicated machines at the first stage
- A survey of scheduling problems with setup times or costs
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective
- Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates
- Flowshop with additional resources during setups: mathematical models and a GRASP algorithm
- Heuristics for periodical batch job scheduling in a MapReduce computing framework
- A note on the two-stage hybrid flow shop problem with dedicated machines
This page was built for publication: A two-stage hybrid flowshop with uniform machines and setup times
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q969780)