Minimizing total weighted flow time of a set of jobs with interval processing times

From MaRDI portal
Publication:969917


DOI10.1016/j.mcm.2009.03.006zbMath1185.90094OpenAlexW2042025920MaRDI QIDQ969917

Tsung-Chyan Lai, Natalja G. Egorova, Yuri N. Sotskov

Publication date: 8 May 2010

Published in: Mathematical and Computer Modelling (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.mcm.2009.03.006



Related Items

Optimality region for job permutation in single-machine scheduling with uncertain processing times, Single machine scheduling problem with interval processing times to minimize mean weighted completion time, Robust scheduling to minimize the weighted number of late jobs with interval due-date uncertainty, The robust (minmax regret) single machine scheduling with interval processing times and total weighted completion time objective, Measures of problem uncertainty for scheduling with interval processing times, Minimizing total weighted completion time with uncertain data: a stability approach, Stability polyhedra of optimal permutation of jobs servicing, Two-machine no-wait flowshop scheduling problem with uncertain setup times to minimize maximum lateness, A MIP formulation for the minmax regret total completion time in scheduling with unrelated parallel machines, Uncertainty measure for the Bellman-Johnson problem with interval processing times, A better dominance relation and heuristics for two-machine no-wait flowshops with maximum lateness performance measure, Minimizing total completion time in a two-machine no-wait flowshop with uncertain and bounded setup times, Minimizing total weighted flow time under uncertainty using dominance and a stability box, A polynomial time heuristic for the two-machine flowshop scheduling problem with setup times and random processing times, Single machine scheduling problem with interval processing times and total completion time objective, Robust min-max regret scheduling to minimize the weighted number of late jobs with interval processing times, Algorithms for minimizing the number of tardy jobs for reducing production cost with uncertain processing times, The dominance digraph as a solution to the two-machine flow-shop problem with interval processing times



Cites Work