The risk element transmission theory research of multi-objective risk-time-cost trade-off
From MaRDI portal
Publication:971715
DOI10.1016/J.CAMWA.2008.10.051zbMATH Open1186.90104OpenAlexW2049299951MaRDI QIDQ971715FDOQ971715
Authors: Cunbin Li, Kecheng Wang
Publication date: 16 May 2010
Published in: Computers & Mathematics with Applications (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.camwa.2008.10.051
Recommendations
- A game theoretic optimization model between project risk set and measure set
- THE MATHEMATICAL MODEL OF PROJECT RISK RESPONSES IN PROJECT RISK MANAGEMENT
- Risk assessment for build-operate-transfer projects: a dynamic multi-objective programming approach
- Project time-cost analysis under generalised precedence relations
- Multi-objective time-cost trade-off in dynamic PERT networks using an interactive approach
Cites Work
- Self-organization and associative memory
- Mean-variance-skewness model for portfolio selection with transaction costs
- Neural networks and physical systems with emergent collective computational abilities
- A logical calculus of the ideas immanent in nervous activity
- Title not available (Why is that?)
- A network flow computation for project cost curves
- Critical-Path Planning and Scheduling: Mathematical Basis
- Optimum Time Compression in Project Scheduling
- Critical Path Problems with Concave Cost-Time Curves
- A multi-objective lead time control problem in multi-stage assembly systems using genetic algorithms
- Multi-objective time-cost trade-off in dynamic PERT networks using an interactive approach
- Distribution function of the shortest path in networks of queues
- Markov and Markov-Regenerative <scp>pert</scp> Networks
- Adaptive pattern classification and universal recoding. I: Parallel development and coding of neural feature detectors
- Adaptive pattern classification and universal recoding. II: Feedback, expectation, olfaction, illusions
Cited In (4)
- A game theoretic optimization model between project risk set and measure set
- Risk assessment for build-operate-transfer projects: a dynamic multi-objective programming approach
- Resource allocation in multi-class dynamic PERT networks with finite capacity
- Resource allocation in dynamic PERT networks with finite capacity
This page was built for publication: The risk element transmission theory research of multi-objective risk-time-cost trade-off
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q971715)