The risk element transmission theory research of multi-objective risk-time-cost trade-off
From MaRDI portal
Publication:971715
DOI10.1016/j.camwa.2008.10.051zbMath1186.90104OpenAlexW2049299951MaRDI QIDQ971715
Publication date: 16 May 2010
Published in: Computers \& Mathematics with Applications (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.camwa.2008.10.051
Related Items (2)
Resource allocation in multi-class dynamic PERT networks with finite capacity ⋮ Resource allocation in dynamic PERT networks with finite capacity
Cites Work
- Unnamed Item
- Self-organization and associative memory
- A multi-objective lead time control problem in multi-stage assembly systems using genetic algorithms
- Multi-objective time-cost trade-off in dynamic PERT networks using an interactive approach
- Adaptive pattern classification and universal recoding. I: Parallel development and coding of neural feature detectors
- Adaptive pattern classification and universal recoding. II: Feedback, expectation, olfaction, illusions
- Distribution function of the shortest path in networks of queues
- A Network Flow Computation for Project Cost Curves
- Mean-variance-skewness model for portfolio selection with transaction costs
- Critical-Path Planning and Scheduling: Mathematical Basis
- Markov and Markov-Regenerative <scp>pert</scp> Networks
- Neural networks and physical systems with emergent collective computational abilities.
- Optimum Time Compression in Project Scheduling
- Critical Path Problems with Concave Cost-Time Curves
- A logical calculus of the ideas immanent in nervous activity
This page was built for publication: The risk element transmission theory research of multi-objective risk-time-cost trade-off