Integrated production and delivery scheduling with disjoint windows
From MaRDI portal
Publication:972326
DOI10.1016/J.DAM.2009.12.010zbMATH Open1186.90052OpenAlexW2063361697MaRDI QIDQ972326FDOQ972326
Authors: Yumei Huo, Joseph Y.-T. Leung, Xin Wang
Publication date: 25 May 2010
Published in: Discrete Applied Mathematics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.dam.2009.12.010
Recommendations
- Integrated Production and Delivery Scheduling with Disjoint Windows
- Coordinated scheduling of production and delivery with production window and delivery capacity constraints
- Coordinated scheduling of production and delivery with production window and delivery capacity constraints
- Integrated production and delivery on parallel batching machines
- Batch machine production with perishability time windows and limited batch size
single machineperishable goodsparallel and identical machinesfully polynomial time approximation schemesNP-hard and strongly NP-hard
Cites Work
- Coordinated supply chain management
- Integrated production/distribution planning in supply chains: An invited review
- Integrated production and distribution operations: taxonomy, models, and review
- Bin packing: Maximizing the number of pieces packed
- Approximating the throughput of multiple machines in real-time scheduling
- Modeling and design of global logistics systems: a review of integrated strategic and tactical models and design algorithms
- Improving the complexities of approximation algorithms for optimization problems
- A note on an open-end bin packing problem
- Batch scheduling of step deteriorating jobs
- The Ordered Open-End Bin-Packing Problem
- Title not available (Why is that?)
Cited In (6)
- Coordinated scheduling of production and delivery with production window and delivery capacity constraints
- Integrating release and dispatch policies in production models
- Coordinated scheduling of production and delivery with production window and delivery capacity constraints
- Integrated production and transportation on parallel batch machines to minimize total weighted delivery time
- Integrated production and delivery on parallel batching machines
- Integrated Production and Delivery Scheduling with Disjoint Windows
This page was built for publication: Integrated production and delivery scheduling with disjoint windows
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q972326)