Minimising earliness and tardiness on parallel machines with sequence-dependent setups
From MaRDI portal
Publication:973440
Recommendations
- Scheduling Unrelated Parallel Machines with Sequence Dependent Setup Times and Weighted Earliness–Tardiness Minimization
- Tabu Search Heuristics for Parallel Machine Scheduling with Sequence-Dependent Setup and Ready Times
- Early/tardy scheduling with sequence dependent setups on uniform parallel machines
- Minimizing weighted earliness-tardiness on parallel machines using hybrid metaheuristics
- Simulated annealing for parallel machine scheduling with earliness-tardiness penalties and sequence-dependent set-up times
Cited in
(10)- Single machine scheduling with family setups to minimize total earliness and tardiness
- Scheduling Unrelated Parallel Machines with Sequence Dependent Setup Times and Weighted Earliness–Tardiness Minimization
- Development of a hybrid metaheuristic to minimise earliness and tardiness in a hybrid flowshop with sequence-dependent setup times
- Minimization of maximum lateness on parallel machines with sequence-dependent setup times and job release dates
- Minimizing the sum of earliness/tardiness in identical parallel machines schedule with incompatible job families: An improved MIP approach
- A moving block heuristic to minimise earliness and tardiness costs on parallel machines
- Tabu Search Heuristics for Parallel Machine Scheduling with Sequence-Dependent Setup and Ready Times
- Simulated annealing for parallel machine scheduling with earliness-tardiness penalties and sequence-dependent set-up times
- Minimizing total tardiness and earliness on unrelated parallel machines with controllable processing times
- Minimizing weighted earliness-tardiness on parallel machines using hybrid metaheuristics
This page was built for publication: Minimising earliness and tardiness on parallel machines with sequence-dependent setups
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q973440)