Minimising earliness and tardiness on parallel machines with sequence-dependent setups
DOI10.1504/IJOR.2010.033103zbMATH Open1188.90102OpenAlexW2109947313MaRDI QIDQ973440FDOQ973440
Authors: Ghazi M. Magableh, Scott J. Mason
Publication date: 31 May 2010
Published in: International Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1504/ijor.2010.033103
Recommendations
- Scheduling Unrelated Parallel Machines with Sequence Dependent Setup Times and Weighted Earliness–Tardiness Minimization
- Tabu Search Heuristics for Parallel Machine Scheduling with Sequence-Dependent Setup and Ready Times
- Early/tardy scheduling with sequence dependent setups on uniform parallel machines
- Minimizing weighted earliness-tardiness on parallel machines using hybrid metaheuristics
- Simulated annealing for parallel machine scheduling with earliness-tardiness penalties and sequence-dependent set-up times
due datesparallel machinestardinessparallel machine schedulingsequence-dependent setupsdispatching rulesearliness
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35)
Cited In (10)
- Single machine scheduling with family setups to minimize total earliness and tardiness
- Tabu Search Heuristics for Parallel Machine Scheduling with Sequence-Dependent Setup and Ready Times
- Minimizing the sum of earliness/tardiness in identical parallel machines schedule with incompatible job families: An improved MIP approach
- Minimization of maximum lateness on parallel machines with sequence-dependent setup times and job release dates
- Minimizing total tardiness and earliness on unrelated parallel machines with controllable processing times
- Minimizing weighted earliness-tardiness on parallel machines using hybrid metaheuristics
- A moving block heuristic to minimise earliness and tardiness costs on parallel machines
- Simulated annealing for parallel machine scheduling with earliness-tardiness penalties and sequence-dependent set-up times
- Scheduling Unrelated Parallel Machines with Sequence Dependent Setup Times and Weighted Earliness–Tardiness Minimization
- Development of a hybrid metaheuristic to minimise earliness and tardiness in a hybrid flowshop with sequence-dependent setup times
This page was built for publication: Minimising earliness and tardiness on parallel machines with sequence-dependent setups
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q973440)