The Browne-Yechiali single-machine sequence is optimal for flow-shops
From MaRDI portal
Publication:976013
DOI10.1016/J.COR.2010.01.006zbMATH Open1188.90104OpenAlexW2009580080MaRDI QIDQ976013FDOQ976013
Assaf Sarig, Jeffrey B. Sidney, Gur Mosheiov
Publication date: 11 June 2010
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2010.01.006
Recommendations
- Optimal sequences in stochastic single machine shops
- Optimal due-date assignment and sequencing in a single machine shop
- Determining the optimal sequences and the distributional properties of their completion times in stochastic flow shops
- Optimal streaming of a single job in a two-stage flow shop
- Uma propriedade estrutural do problema de programação da produção flow shop permutacional com tempos de setup
- Optimal Assignment of Total-work-content Due-dates and Sequencing in a Single-machine Shop
- scientific article
- Optimal assignment of NOP due-dates and sequencing in a single machine shop
- Asymptotically optimal schedules for single-server flow shop problems with setup costs and times
Cites Work
- Title not available (Why is that?)
- Two‐machine flowshop scheduling with conditional deteriorating second operations
- Scheduling Deteriorating Jobs on a Single Processor
- NP-hard cases in scheduling deteriorating jobs on dedicated machines
- A concise survey of scheduling with time-dependent processing times
- Flow shop scheduling problems with deteriorating jobs under dominating machines
- Flow shop scheduling problems with decreasing linear deterioration under dominant machines
- Complexity analysis of job-shop scheduling with deteriorating jobs
- Total completion time in a two-machine flowshop with deteriorating tasks
- Flow shop scheduling problems with deteriorating jobs on no-idle dominant machines
Cited In (7)
- Scheduling piecewise linear deteriorating jobs to minimize makespan in a two-machine flowshop
- Makespan minimization on three-machine flow shop with deteriorating jobs
- Permutation flowshop scheduling with simple linear deterioration
- Multiobjective fuzzy mixed assembly line sequencing optimization model
- A review of four decades of time-dependent scheduling: main results, new topics, and open problems
- Minimizing total load on a proportionate flowshop with position-dependent processing times and job-rejection
- Permutation flow shop problem with shortening job processing times
This page was built for publication: The Browne-Yechiali single-machine sequence is optimal for flow-shops
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q976013)