Setting a common due date in a constrained flowshop: a variable neighbourhood search approach
DOI10.1016/J.COR.2010.01.002zbMATH Open1188.90106OpenAlexW2139996487MaRDI QIDQ976037FDOQ976037
Authors: Paz Perez-Gonzalez, Jose M. Framinan
Publication date: 11 June 2010
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://idus.us.es/xmlui/handle/11441/23449
Recommendations
- Minimizing tardy jobs in a flowshop with common due date
- A note on a due-date assignment on a two-machine flow-shop
- On the variable common due date, minimal tardy jobs bicriteria two-machine flow shop problem with ordered machines
- An \(O(n^{2})\) algorithm for the variable common due date, minimal tardy jobs bicriteria two-machine flow shop problem with ordered machines
- Scheduling in a two-machine flowshop for the minimization of the mean absolute deviation from a common due date
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Title not available (Why is that?)
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- An improved approximation algorithm for two-machine flow shop scheduling with an availability constraint
- Multicriteria scheduling. Theory, models and algorithms. Translated from the French by Henry Scott.
- Tabu search for total tardiness minimization in flowshop scheduling problems
- Variable neighborhood search
- The Complexity of Flowshop and Jobshop Scheduling
- Title not available (Why is that?)
- Variable neighborhood search: Principles and applications
- Scheduling in flowshops to minimize total tardiness of jobs
- A comprehensive review and evaluation of permutation flowshop heuristics
- Benchmarks for basic scheduling problems
- A discrete particle swarm optimization algorithm for the no-wait flowshop scheduling problem
- A review and classification of heuristics for permutation flow-shop scheduling with makespan objective
- A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem
- Some efficient heuristic methods for the flow shop sequencing problem
- Design and analysis of experiments.
- Rescheduling on a single machine with part-type dependent setup times and deadlines
- Rescheduling for New Orders
- A review and evaluation of multiobjective algorithms for the flowshop scheduling problem
- Total tardiness minimization in permutation flow shops: a simple approach based on a variable greedy algorithm
- Scheduling in a two-machine flowshop for the minimization of the mean absolute deviation from a common due date
- Title not available (Why is that?)
- Minimizing the bicriteria of makespan and maximum tardiness with an upper bound on maximum tardiness
- Parallel machines scheduling with nonsimultaneous machine available time
- Metaheuristic approaches for the two-machine flow-shop problem with weighted late work criterion and common due date
- A new heuristic for \(m\)-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness
- Minimizing the sum of absolute deviations about a common due date for the two-machine flow shop problem
- Scheduling permutation flowshops with initial availability constraint: Analysis of solutions and constructive heuristics
- The choice of dispatching rules in a shop using internally set due-dates with quoted leadtime and tardiness costs
Cited In (2)
Uses Software
This page was built for publication: Setting a common due date in a constrained flowshop: a variable neighbourhood search approach
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q976037)