Solving the discrete time/resource trade-off problem in project scheduling with genetic algorithms
DOI10.1016/J.AMC.2007.02.109zbMATH Open1193.90110OpenAlexW2059220531MaRDI QIDQ990459FDOQ990459
Authors: Mohammad R. Ranjbar, Fereydoon Kianfar
Publication date: 1 September 2010
Published in: Applied Mathematics and Computation (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.amc.2007.02.109
Recommendations
- A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling
- A genetic algorithm for multi-mode resource constrained project scheduling problem
- Local search methods for the discrete time/resource trade-off problem in project networks
- An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: the single mode case
- Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Title not available (Why is that?)
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
- Local search methods for the discrete time/resource trade-off problem in project networks
- Resource-constrained project scheduling: A critical activity reordering heuristic
- A hybrid scatter search/electromagnetism meta-heuristic for project scheduling
Cited In (14)
- Solving the resource availability cost problem in project scheduling by path relinking and genetic algorithm
- Project scheduling with finite or infinite number of activity processing modes -- a survey
- A survey of variants and extensions of the resource-constrained project scheduling problem
- A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints
- A priority-rule method for project scheduling with work-content constraints
- Title not available (Why is that?)
- Revenue sharing for resource transfer among projects
- Optimal workforce assignment to operations of a paced assembly line
- Generating a robust baseline schedule for the robust discrete time/resource trade-off problem under work content uncertainty
- Railway scheduling reduces the expected project makespan over roadrunner scheduling in a multi-mode project scheduling environment
- Controllable processing times in project and production management: analysing the trade-off between processing times and the amount of resources
- A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling
- A decomposed branch-and-price procedure for integrating demand planning in personnel staffing problems
- On the choice of baseline schedules for the discrete time/resource trade-off problem under stochastic environment
This page was built for publication: Solving the discrete time/resource trade-off problem in project scheduling with genetic algorithms
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q990459)