Solving the discrete time/resource trade-off problem in project scheduling with genetic algorithms
From MaRDI portal
(Redirected from Publication:990459)
Recommendations
- A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling
- A genetic algorithm for multi-mode resource constrained project scheduling problem
- Local search methods for the discrete time/resource trade-off problem in project networks
- An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: the single mode case
- Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms
Cites work
- scientific article; zbMATH DE number 3497315 (Why is no real title available?)
- A hybrid scatter search/electromagnetism meta-heuristic for project scheduling
- Local search methods for the discrete time/resource trade-off problem in project networks
- Resource-constrained project scheduling: A critical activity reordering heuristic
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
Cited in
(14)- On the choice of baseline schedules for the discrete time/resource trade-off problem under stochastic environment
- Solving the resource availability cost problem in project scheduling by path relinking and genetic algorithm
- Project scheduling with finite or infinite number of activity processing modes -- a survey
- A survey of variants and extensions of the resource-constrained project scheduling problem
- A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints
- A priority-rule method for project scheduling with work-content constraints
- Optimal workforce assignment to operations of a paced assembly line
- scientific article; zbMATH DE number 558542 (Why is no real title available?)
- Revenue sharing for resource transfer among projects
- Generating a robust baseline schedule for the robust discrete time/resource trade-off problem under work content uncertainty
- Railway scheduling reduces the expected project makespan over roadrunner scheduling in a multi-mode project scheduling environment
- Controllable processing times in project and production management: analysing the trade-off between processing times and the amount of resources
- A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling
- A decomposed branch-and-price procedure for integrating demand planning in personnel staffing problems
This page was built for publication: Solving the discrete time/resource trade-off problem in project scheduling with genetic algorithms
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q990459)