A decomposition-based stochastic programming approach for the project scheduling problem under time/cost trade-off settings and uncertain durations
DOI10.1016/J.COR.2010.03.002zbMATH Open1231.90114OpenAlexW2036983427MaRDI QIDQ991368FDOQ991368
Authors: E. Klerides, Eleni Hadjiconstantinou
Publication date: 7 September 2010
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2010.03.002
Recommendations
- Multi-resource allocation in stochastic project scheduling
- A two-stage stochastic programming approach for project planning with uncertain activity durations
- Project scheduling problem with stochastic activity duration times
- Two uncertain chance-constrained programming models for time-cost trade-off problem
- A heuristic approach for resource constrained project scheduling with uncertain activity durations
Stochastic programming (90C15) Stochastic network models in operations research (90B15) Stochastic scheduling theory in operations research (90B36)
Cites Work
- L-Shaped Linear Programs with Applications to Optimal Control and Stochastic Programming
- Project scheduling. A research handbook.
- Resource-constrained project scheduling: Notation, classification, models, and methods
- The value of the stochastic solution in stochastic linear programs with fixed recourse
- Complexity of the Discrete Time-Cost Tradeoff Problem for Project Networks
- The discrete time-cost tradeoff problem revisited
- Network decomposition-based benchmark results for the discrete time-cost tradeoff problem
- A Stochastic Branch-and-Bound Approach to Activity Crashing in Project Management
- A two-stage stochastic programming approach for project planning with uncertain activity durations
- New computational results on the discrete time/cost trade-off problem in project networks
- Critical path planning under uncertainty
- Two-Stage Fleet Assignment Model Considering Stochastic Passenger Demands
- A new path-based cutting plane approach for the discrete time-cost tradeoff problem
- On the optimal management of project risk
- Bounding the expected time-cost curve for a stochastic PERT network from below
Cited In (16)
- An agency perspective for multi-mode project scheduling with time/cost trade-offs
- Operating room surgery scheduling with fuzzy surgery durations using a metaheuristic approach
- Analysis of a time-cost trade-off in a resource-constrained GERT project scheduling problem using the Markov decision process
- A hybrid simulation-optimization approach for the robust discrete time/cost trade-off problem
- An algorithmic framework for solving large-scale multistage stochastic mixed 0-1 problems with nonsymmetric scenario trees
- Modeling stochastic project time-cost trade-offs with time-dependent activity durations
- A heuristic approach for resource constrained project scheduling with uncertain activity durations
- Cluster Lagrangean decomposition in multistage stochastic optimization
- A parallel branch-and-fix coordination based matheuristic algorithm for solving large sized multistage stochastic mixed 0-1 problems
- Robust scheduling and robustness measures for the discrete time/cost trade-off problem
- Bi-level multiple mode resource-constrained project scheduling problems under hybrid uncertainty
- Title not available (Why is that?)
- A two-stage stochastic programming approach for project planning with uncertain activity durations
- Genetic tabu search for the fuzzy flexible job shop problem
- Robust proactive project scheduling model for the stochastic discrete time/cost trade-off problem
- Multi-resource allocation in stochastic project scheduling
This page was built for publication: A decomposition-based stochastic programming approach for the project scheduling problem under time/cost trade-off settings and uncertain durations
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q991368)