A model, heuristic procedure and decision support system for solving the movie shoot scheduling problem
From MaRDI portal
Publication:991840
DOI10.1007/s00291-007-0103-6zbMath1193.90094OpenAlexW1988292213MaRDI QIDQ991840
Publication date: 8 September 2010
Published in: OR Spectrum (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s00291-007-0103-6
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (5)
An enhanced branch-and-bound algorithm for the talent scheduling problem ⋮ Models and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendars ⋮ Modelling and solving generalised operational surgery scheduling problems ⋮ Estimating the potential of collaborating professionals, with an application to the Dutch film industry ⋮ A survey of variants and extensions of the resource-constrained project scheduling problem
Cites Work
- Unnamed Item
- Unnamed Item
- Experimental investigation of heuristics for resource-constrained project scheduling: an update
- Threshold accepting: A general purpose optimization algorithm appearing superior to simulated annealing
- Optimal scheduling in film production to minimize talent hold cost
- Project scheduling. A research handbook.
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Heuristic methods for evolutionary computation techniques
This page was built for publication: A model, heuristic procedure and decision support system for solving the movie shoot scheduling problem