A survey of variants and extensions of the resource-constrained project scheduling problem

From MaRDI portal
Publication:992569

DOI10.1016/j.ejor.2009.11.005zbMath1205.90123OpenAlexW2140742285MaRDI QIDQ992569

Sönke Hartmann, Dirk Briskorn

Publication date: 9 September 2010

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: http://hdl.handle.net/10419/45542




Related Items (only showing first 100 items - show all)

A metaheuristic solution approach for the time-constrained project scheduling problemOn the efficient modeling and solution of the multi-mode resource-constrained project scheduling problem with generalized precedence relationsA flow-based tabu search algorithm for the RCPSP with transfer timesAn exact algorithm for an integrated project staffing problem with a homogeneous workforceA heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraintsAn automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problemMIP models for resource-constrained project scheduling with flexible resource profilesA tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphsThe impact of solution representations on heuristic net present value optimization in discrete time/cost trade-off project scheduling with multiple cash flow and payment modelsMulti-mode resource availability cost problem with recruitment and release dates for resourcesWhich fuzzy ranking method is best for maximizing fuzzy net present value?A single machine scheduling problem with two-dimensional vector packing constraintsAn effective branch-and-price algorithm for the preemptive resource constrained project scheduling problem based on minimal interval order enumerationScheduling resource-constrained projects with a flexible project structureBi-objective multi-mode project scheduling under risk aversionThe sample analysis machine scheduling problem: definition and comparison of exact solving approachesAn approach using SAT solvers for the RCPSP with logical constraintsModels and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendarsEvolutionary multi-objective resource allocation and scheduling in the Chinese navigation satellite system projectRevising history for cost-informed process improvementMulti-mode resource-constrained project scheduling problems with non-preemptive activity splittingSurvey of quantitative methods in constructionVariable neighbourhood search and tabu search for a discrete time/cost trade-off problem to minimize the maximal cash flow gapTotal completion time minimization for machine scheduling problem under time windows constraints with jobs' linear processing rate functionAn exact composite lower bound strategy for the resource-constrained project scheduling problemSolving software project scheduling problems with ant colony optimizationModelling and solving generalised operational surgery scheduling problemsA Petri net-based framework for realistic project management and scheduling: an application in animation and videogamesMultiobjective project portfolio selection with fuzzy constraintsA resource type analysis of the integrated project scheduling and personnel staffing problemGenetic algorithm for the resource-constrained project scheduling problemFormulating and solving a multi-mode resource-collaboration and constrained scheduling problem (MRCCSP)A branch and bound algorithm for project scheduling problem with spatial resource constraintsControllable processing times in project and production management: analysing the trade-off between processing times and the amount of resourcesA biased random-key genetic algorithm for the project scheduling problem with flexible resourcesA polyhedral study of event-based models for the resource-constrained project scheduling problemIntegration of routing into a resource-constrained project scheduling problemOptimizing temporary work and overtime in the time cost quality trade-off problemSimple matching vs linear assignment in scheduling models with positional effects: a critical reviewThe total adjustment cost problem: applications, models, and solution algorithmsPacking chained items in aligned bins with applications to container transshipment and project schedulingIntegrated truck and workforce scheduling to accelerate the unloading of trucksModeling and simulation of project management through the PMBOK\(^{\circledR}\) standard using complex networksResource constrained routing and scheduling: review and research prospectsResource leveling in a machine environmentScheduling personnel for the build-up of unit load devices at an air cargo terminal with limited spaceA game theoretical approach to sharing penalties and rewards in projectsAn applicable method for modifying over-allocated multi-mode resource constraint schedules in the presence of preemptive resourcesFinding an optimal Nash equilibrium to the multi-agent project scheduling problemProject scheduling with flexible resources: formulation and inequalitiesA modified PSO algorithm for minimizing the total costs of resources in MRCPSPA hybrid multiobjective genetic algorithm for robust resource-constrained project scheduling with stochastic durationsCompetence-based estimation of activity duration in IT projectsBranch and bound algorithms for resource constrained project scheduling problem subject to nonrenewable resources with prescheduled procurementMulti-objective multi-mode resource constrained project scheduling problem using Pareto-based algorithmsMultimode preemptive resource investment problem subject to due dates for activities: formulation and solution procedureApproximate policy iteration for dynamic resource-constrained project schedulingSimultaneous lotsizing and scheduling considering secondary resources: a general model, literature review and classificationDesigning a framework to improve time series data of construction projects: application of a simulation model and singular spectrum analysisThe bilevel optimisation of a multi-agent project scheduling and staffing problemMaximizing the expected net present value in a project with uncertain cash flowsA study of the Bienstock-Zuckerberg algorithm: applications in mining and resource constrained project scheduling\(\mathrm{A}^\ast\) search for prize-collecting job sequencing with one common and multiple secondary resourcesA local search framework for industrial test laboratory schedulingRevenue sharing for resource reallocation among project activity contractorsAn updated survey of variants and extensions of the resource-constrained project scheduling problemResource tardiness weighted cost minimization in project schedulingOptimizing version release dates of research and development long-term processesA multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problemA column generation approach for the integrated shift and task scheduling problem of logistics assistants in hospitalsA buffer control method for top-down project controlMaximizing the expected net present value of a project with phase-type distributed activity durations: an efficient globally optimal solution procedureA bi-level programming approach for global investment strategies with financial intermediationMetaheuristics for multi-mode capital-constrained project payment schedulingResource-constrained project scheduling with activity splitting and setup timesA survey of hybrid metaheuristics for the resource-constrained project scheduling problemAn adaptive large neighbourhood search heuristic for routing and scheduling feeder vessels in multi-terminal ports\( \mathrm{A}^*\) -based construction of decision diagrams for a prize-collecting scheduling problemA column generation-based diving heuristic to solve the multi-project personnel staffing problem with calendar constraints and resource sharingUsing schedule risk analysis with resource constraints for project controlMaximising the weighted number of activity execution modes in project planningPortfolio decision analysis: recent developments and future prospectsA new algorithm for resource-constrained project scheduling with breadth and depth of skillsMinimizing total weighted late work in the resource-constrained project scheduling problemJob sequencing with one common and multiple secondary resources: an A*/beam search based anytime algorithmDynamic multiobjective software project scheduling optimization method based on firework algorithmSimulated annealing for financing cost distribution based project payment scheduling from a joint perspectiveRailway scheduling reduces the expected project makespan over roadrunner scheduling in a multi-mode project scheduling environmentResilience analysis for project scheduling with renewable resource constraint and uncertain activity durationsDiversity based selection for many-objective evolutionary optimisation problems with constraintsSolving a multi-resource partial-ordering flexible variant of the job-shop scheduling problem with hybrid ASPImmediate schedule adjustment and semidefinite relaxationA decomposed branch-and-price procedure for integrating demand planning in personnel staffing problemsDouble girder bridge crane with double cycling: scheduling strategy and performance evaluationSolving the integrated multi-period scheduling routing problem for cleaning debris in the aftermath of disastersImproved formulations and new valid inequalities for a hybrid flow shop problem with time-varying resources and chaining time-lagScheduling with an orthogonal resource constraintShort- and medium-term optimization of underground mine planning using constraint programmingPersonnel scheduling and supplies provisioning in emergency relief operationsA computational study of constraint programming approaches for resource-constrained project scheduling with autonomous learning effects


Uses Software


Cites Work


This page was built for publication: A survey of variants and extensions of the resource-constrained project scheduling problem