Robust scheduling and robustness measures for the discrete time/cost trade-off problem
From MaRDI portal
Publication:992657
DOI10.1016/j.ejor.2010.05.046zbMath1205.90124OpenAlexW2111525589MaRDI QIDQ992657
Mohamed Haouari, Erdal Erel, Öncü Hazır
Publication date: 9 September 2010
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: http://hdl.handle.net/11693/22083
Related Items (17)
A float-path theory and its application to the time-cost tradeoff problem ⋮ A hybrid simulation-optimization approach for the robust discrete time/cost trade-off problem ⋮ Min-Max Regret Version of the Linear Time–Cost Tradeoff Problem with Multiple Milestones and Completely Ordered Jobs ⋮ A reduction tree approach for the discrete time/cost trade-off problem ⋮ Generating a robust baseline schedule for the robust discrete time/resource trade-off problem under work content uncertainty ⋮ The impact of reserve duties on the robustness of a personnel shift roster: an empirical investigation ⋮ Multimode time-cost-robustness trade-off project scheduling problem under uncertainty ⋮ Project scheduling cost optimization based on resource transfer costs and robustness ⋮ Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty ⋮ Tabu search for proactive project scheduling problem with flexible resources ⋮ An agency perspective for multi-mode project scheduling with time/cost trade-offs ⋮ Determination of early warning time window for bottleneck resource buffer ⋮ Recent advances in robust optimization: an overview ⋮ Employee substitutability as a tool to improve the robustness in personnel scheduling ⋮ A fuzzy robustness measure for the scheduling of commissioned product development projects ⋮ Resilience analysis for project scheduling with renewable resource constraint and uncertain activity durations ⋮ Maximizing the number of jobs scheduled at their baseline starting times in case of machine failures
Cites Work
- The discrete time/cost trade-off problem: Extensions and heuristic procedures
- A decomposition-based stochastic programming approach for the project scheduling problem under time/cost trade-off settings and uncertain durations
- Discrete time/cost trade-off problem: a decomposition-based solution algorithm for the budget version
- The discrete time-cost tradeoff problem revisited
- Optimal procedures for the discrete time/cost trade-off problem in project networks
- On the optimal management of project risk
- Project scheduling under uncertainty: survey and research potentials
- Network decomposition-based benchmark results for the discrete time-cost tradeoff problem
- Proactive heuristic procedures for robust project scheduling: An experimental analysis
- An investigation of buffer sizing techniques in critical chain scheduling
- New computational results on the discrete time/cost trade-off problem in project networks
- Optimal Reduction of Two-Terminal Directed Acyclic Graphs
- Complexity of the Discrete Time-Cost Tradeoff Problem for Project Networks
- Solving time/cost trade-off problems with discounted cash flows using generalized benders decomposition
This page was built for publication: Robust scheduling and robustness measures for the discrete time/cost trade-off problem