Recovering Cyclic Schedules Using Dynamic Produce-Up-To Policies
From MaRDI portal
Recommendations
- When is a base stock policy optimal in recovering disrupted cyclic schedules?
- scientific article; zbMATH DE number 795178
- Scheduling the Production of Several Items with Random Demands in a Single Facility
- Recovering cyclic schedules from delay
- Alternative control mechanisms for cyclical scheduling systems
Cited in
(11)- Recovery strategies from major supply disruptions in single and multiple sourcing networks
- A quantitative model for disruption mitigation in a supply chain
- A disruption recovery model for a single stage production-inventory system
- Recovering cyclic schedules from delay
- Optimal production-inventory policy for the multi-period fixed proportions co-production system
- Real time disruption management for a two-stage batch production-inventory system with reliability considerations
- A disruption recovery plan in a three-stage production-inventory system
- When is a base stock policy optimal in recovering disrupted cyclic schedules?
- Adopting a hierarchical diagnosis and treatment system to optimize elective surgery scheduling
- The stochastic economic lot scheduling problem: a survey
- Managing risk and disruption in production-inventory and supply chain systems: a review
This page was built for publication: Recovering Cyclic Schedules Using Dynamic Produce-Up-To Policies
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5322127)