Resolution of a scheduling problem in a flowshop robotic cell
From MaRDI portal
Recommendations
Cites work
- scientific article; zbMATH DE number 5345853 (Why is no real title available?)
- scientific article; zbMATH DE number 736667 (Why is no real title available?)
- scientific article; zbMATH DE number 194544 (Why is no real title available?)
- A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process
- A comparison of heuristics for family and job scheduling in a flow-line manufacturing cell
- A generalized permutation approach to job shop scheduling with genetic algorithms
- Combinatorial optimization models for production scheduling in automated manufacturing systems
- Cycles and permutations in robotic cells
- Minimizing Cycle Time in a Blocking Flowshop
- ON AN AUTOMATED TWO-MACHINE FLOWSHOP SCHEDULING PROBLEM WITH INFINITE BUFFER
Cited in
(15)- scientific article; zbMATH DE number 6907687 (Why is no real title available?)
- Exact method for robotic cell problem
- Scheduling in manufacturing with transportation: classification and solution techniques
- Exact methods for the robotic cell problem
- Cyclic scheduling of parts and robot moves in m-machine robotic cells
- Throughput optimization for the robotic cell problem with controllable processing times
- An improved algorithm for cyclic flowshop scheduling in a robotic cell
- Dynamic scheduling of a picking robot with limited buffer and rejection: an industrial case study
- A scheduling problem in blocking hybrid flow shop robotic cells with multiple robots
- Scheduling a wet station for wafer cleaning with multiple job flows and multiple wafer-handling robots
- On a scheduling problem in a robotized analytical system
- Makespan minimization for flow-shop problems with transportation times and a single robot
- Scheduling on parallel machines with preemption and transportation delays
- Complexity of one-cycle robotic flow-shops
- New complexity results on scheduling problem in a robotic cell
This page was built for publication: Resolution of a scheduling problem in a flowshop robotic cell
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1887770)