Robust Estimation of the Process Standard Deviation for Control Charts
From MaRDI portal
Recommendations
- A two-step robust estimation of the process mean using M-estimator
- A robust R control chart based on a two-step estimator of the process dispersion
- scientific article; zbMATH DE number 2046539
- Tables to calculate untrimmed range and standard deviation estimates from trimmed estimates
- THE MEDIAN ABSOLUTE DEVIATIONS AND THEIR APPLICATIONS TO SHEWHART CONTROL CHARTS
Cited in
(18)- Asymmetric control limits for range chart with simple robust estimator under the non-normal distributed process
- A robust R control chart based on a two-step estimator of the process dispersion
- A mean deviation-based approach to monitor process variability
- A Dispersion Control Chart
- Applied regression analysis bibliography update 1994-97
- THE MEDIAN ABSOLUTE DEVIATIONS AND THEIR APPLICATIONS TO SHEWHART CONTROL CHARTS
- EFFECT OF ESTIMATION OF THE PROCESS PARAMETERS ON THE CONTROL LIMITS OF THE UNIVARIATE CONTROL CHARTS FOR PROCESS DISPERSION
- scientific article; zbMATH DE number 946617 (Why is no real title available?)
- scientific article; zbMATH DE number 7377402 (Why is no real title available?)
- Robust residual control chart for contaminated time series: A solution to the effects of outlier-driven parameter misestimation on the control chart performance
- A new robust ratio estimator with reference to non-normal distribution
- Robust dual-CUSUM control charts for contaminated processes
- A two-step robust estimation of the process mean using M-estimator
- On sigma-estimators from a normal universe
- Comparison of Robust Estimators of Standard Deviation in Normal Distributions Within the Context of Quality Control
- Monitoring process variability using auxiliary information
- Enhancing process stability with robust charts using high breakdown point estimators in contaminated settings: an application in healthcare monitoring*
- Estimating the limits for statistical process control charts: a direct method improving upon the bootstrap
This page was built for publication: Robust Estimation of the Process Standard Deviation for Control Charts
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4365694)