Robust absolute single machine makespan scheduling-location problem on trees
From MaRDI portal
Recommendations
- 2-approximation algorithm for minmax absolute maximum lateness scheduling-location problem
- Robust single machine makespan scheduling with release date uncertainty
- On the robust single machine scheduling problem
- Single machine robust scheduling with budgeted uncertainty
- Algorithms and complexity analysis for robust single-machine scheduling problems
Cites work
- Algorithms for the robust 1-center problem on a tree
- scientific article; zbMATH DE number 2242479 (Why is no real title available?)
- Integrated scheduling and location models: single machine makespan problems
- Minmax-regret robust 1-median location on a tree
- Robust optimization
- Simultaneous scheduling and location (ScheLoc): The planar ScheLoc makespan problem
- Solving scheduling and location problems in the plane simultaneously
- Technical Note—Convex Programming with Set-Inclusive Constraints and Applications to Inexact Linear Programming
Cited in
(11)- 2-approximation algorithm for minmax absolute maximum lateness scheduling-location problem
- Robust single machine makespan scheduling with release date uncertainty
- An exact framework for the discrete parallel machine scheduling location problem
- Exact and matheuristic methods for the parallel machine scheduling and location problem with delivery time and due date
- Novel formulations and logic-based Benders decomposition for the integrated parallel machine scheduling and location problem
- Scheduling-location problem with drones
- An integrated approach for allocation and scheduling-location problems on graphs
- Robust reverse 1-center problems on trees with interval costs
- Single-machine makespan scheduling with scenario-dependent release dates
- Combinatorial algorithms for the minmax robust median subtree problem on tree networks with interval vertex weights
- The minmax regret scheduling-location problem on trees with interval-data edge lengths
This page was built for publication: Robust absolute single machine makespan scheduling-location problem on trees
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2294524)