SPT optimality (mostly) via linear programming
From MaRDI portal
Recommendations
- How good are SPT schedules for fair optimality criteria
- On the Asymptotic Optimality of the SPT Rule for the Flow Shop Average Completion Time Problem
- SPT is optimally competitive for uniprocessor flow
- A note on a proof of SPT optimality for single-machine sequencing problems via the transportation problem
- The Asymptotic Optimality of the SPT Rule for the Flow Shop Mean Completion Time Problem
Cites work
- scientific article; zbMATH DE number 44978 (Why is no real title available?)
- scientific article; zbMATH DE number 2146482 (Why is no real title available?)
- scientific article; zbMATH DE number 3793772 (Why is no real title available?)
- scientific article; zbMATH DE number 876684 (Why is no real title available?)
- On the facial structure of scheduling polyhedra
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Scheduling algorithms
- Scheduling to Minimize Average Completion Time: Off-Line and On-Line Approximation Algorithms
- Single-Machine Scheduling Polyhedra with Precedence Constraints
- Structure of a simple scheduling polyhedron
- Two-Dimensional Gantt Charts and a Scheduling Algorithm of Lawler
Cited in
(3)
This page was built for publication: SPT optimality (mostly) via linear programming
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6161291)