Scheduling a Multi-Product Single Machine System
From MaRDI portal
Cited in
(14)- A job-splitting heuristic for lot-size scheduling in multi-stage, multi- product production processes
- The economic lot scheduling problem without capacity constraints
- Cyclic lot-sizing problems with sequencing costs
- A multiproduct single machine economic production quantity (EPQ) inventory model with discrete delivery order, joint production policy and budget constraints
- High multiplicity scheduling with switching costs for few products
- Economic operating policy and variations in production load
- Determination of economic production quantities for a two-product single machine system
- Multi-stage production/inventory deterministic lot size computations
- The G-group heuristic for single machine lot scheduling
- An improved algorithm for solving the economic lot size problem (ELSP)
- The economic lot scheduling problem under power-of-two policy
- Optimization of the decentralized cash management problem
- The economic lot scheduling problem: a pure genetic search approach
- Multi-stage production-inventory systems
This page was built for publication: Scheduling a Multi-Product Single Machine System
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5671772)