Scheduling a single machine with primary and secondary objectives
Summary: We study a scheduling problem in which jobs with release times and due dates are to be processed on a single machine. With the primary objective to minimize the maximum job lateness, the problem is strongly NP-hard. We describe a general algorithmic scheme to minimize the maximum job lateness, with the secondary objective to minimize the maximum job completion time. The problem of finding the Pareto-optimal set of feasible solutions with these two objective criteria is strongly NP-hard. We give the dominance properties and conditions when the Pareto-optimal set can be formed in polynomial time. These properties, together with our general framework, provide the theoretical background, so that the basic framework can be expanded to (exponential-time) implicit enumeration algorithms and polynomial-time approximation algorithms (generating the Pareto sub-optimal frontier with a fair balance between the two objectives). Some available in the literature experimental results confirm the practical efficiency of the proposed framework.
- The Pareto-optimal set of the NP-hard problem of minimization of the maximum lateness for a single machine
- Pareto optima for total weighted completion time and maximum lateness on a single machine
- Pareto‐scheduling with double‐weighted jobs to minimize the weighted number of tardy jobs and total weighted late work
- Minimizing Maximum Promptness and Maximum Lateness on a Single Machine
- Scheduling unit processing time jobs on a single machine with multiple criteria
- A better algorithm for sequencing with release and delivery times on identical machines
- A block approach for single-machine scheduling with release dates and due dates
- An approximation algorithm for a single-machine scheduling problem with release times and delivery times
- Approximation algorithms for no idle time scheduling on a single machine with release times and delivery times
- Branch-and-bound algorithms for solving hard instances of the one-machine sequencing problem
- scientific article; zbMATH DE number 3550182 (Why is no real title available?)
- scientific article; zbMATH DE number 3639144 (Why is no real title available?)
- Jackson's Rule for Single-Machine Scheduling: Making a Good Heuristic Better
- Jackson's semi-preemptive scheduling on a single machine
- Multicriteria Optimization
- On Scheduling with Ready Times and Due Dates to Minimize Maximum Lateness
- On single-machine scheduling without intermediate delays
- PERFORMANCE ANALYSIS OF SIX APPROXIMATION ALGORITHMS FOR THE ONE-MACHINE MAXIMUM LATENESS SCHEDULING PROBLEM WITH READY TIMES
- Scheduling jobs with equal processing times on a single machine: minimizing maximum lateness and makespan
- Single machine scheduling to minimize maximum lateness subject to release dates and precedence constraints
- Technical Note—Analysis of a Heuristic for One Machine Sequencing with Release Dates and Delivery Times
- The one-machine sequencing problem
- The Pareto-optimal set of the NP-hard problem of minimization of the maximum lateness for a single machine
- Theoretical expectation versus practical performance of Jackson's heuristic
- The Pareto-optimal set of the NP-hard problem of minimization of the maximum lateness for a single machine
- Approximation algorithms for minimizing the maximum lateness and makespan on parallel machines
- Editorial. Special issue on algorithms for scheduling problems
- Pareto optima for total weighted completion time and maximum lateness on a single machine
- Primary-secondary bicriteria scheduling on identical machines to minimize the total completion time of all jobs and the maximum T-time of all machines
- Bicriterion Pareto‐scheduling of equal‐length jobs on a single machine related to the total weighted late work
- Approximation schemes for scheduling jobs on identical parallel machines to minimize the maximum lateness and makespan
This page was built for publication: Scheduling a single machine with primary and secondary objectives