Scheduling chains to minimize mean flow time
From MaRDI portal
Recommendations
- Scheduling chain-structured tasks to minimize makespan and mean flow time
- Minimizing Schedule Length Subject to Minimum Flow Time
- Preemptive scheduling to minimize mean weighted flow time
- Minimizing the maximum flow time in batch scheduling
- Minimization of mean flow time for some discrete-continuous scheduling problems
- Simultaneous Resource Scheduling to Minimize Weighted Flow Times
- Scheduling semi-malleable jobs to minimize mean flow time
- A FLOWSHOP SCHEDULING ALGORITHM TO MINIMIZE TOTAL FLOWTIME
- SCHEDULING TO MINIMIZE MAX FLOW TIME: OFF-LINE AND ON-LINE ALGORITHMS
- Scheduling in flowshops to minimize total tardiness of jobs
Cites work
- scientific article; zbMATH DE number 108110 (Why is no real title available?)
- scientific article; zbMATH DE number 3639144 (Why is no real title available?)
- New results on the completion time variance minimization
- Scheduling chain-structured tasks to minimize makespan and mean flow time
- Scheduling independent tasks to reduce mean finishing time
Cited in
(13)- Minimizing total flow time and total completion time with immediate dispatching
- Scheduling semi-malleable jobs to minimize mean flow time
- Inequality-sum: a global constraint capturing the objective function
- A review of four decades of time-dependent scheduling: main results, new topics, and open problems
- Minimizing the maximum flow time in batch scheduling
- Scheduling of parallel machines to minimize total completion time subject to s-precedence constraints
- `Strong'-`weak' precedence in scheduling: extensions to series-parallel orders
- Single-machine scheduling problems with precedence constraints and simple linear deterioration
- REAL-TIME DISPATCHING: SCHEDULING STABILITY AND PRECEDENCE
- Single-machine scheduling with precedence constraints and position-dependent processing times
- Linear and quadratic algorithms for scheduling chains and opposite chains
- Tree precedence in scheduling: The strong-weak distinction
- Minimizing Mean Flow Time With Release Time and Deadline Constraints
This page was built for publication: Scheduling chains to minimize mean flow time
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q290213)