Scheduling multiprocessor tasks on two parallel processors
From MaRDI portal
Recommendations
- Scheduling multiprocessor tasks for mean flow time criterion
- Scheduling Multiprocessor Tasks to Minimize Schedule Length
- Scheduling multiprocessor tasks on parallel processors with limited availability.
- Linear algorithms for preemptive scheduling of multiprocessor tasks subject to minimal lateness
- Preemptive multiprocessor task scheduling with release times and time windows
Cites work
- A note on scheduling tall/small multiprocessor tasks with unit processing time to minimize maximum tardiness
- Complexity of scheduling multiprocessor tasks with prespecified processors allocations
- Complexity of Scheduling Parallel Task Systems
- Concurrent Task Systems
- Corrigendum to: ``Scheduling multiprocessor tasks on three dedicated processors
- scientific article; zbMATH DE number 1128827 (Why is no real title available?)
- Matrix multiplication via arithmetic progressions
- Multiprocessor scheduling with communication delays
- Optimal scheduling for two-processor systems
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Preemptive Scheduling of Real-Time Tasks on Multiprocessor Systems
- Scheduling File Transfers
- Scheduling multiprocessor tasks -- An overview
- Scheduling Multiprocessor Tasks to Minimize Schedule Length
- Scheduling multiprocessor tasks with chain constraints
- Scheduling Tasks with Nonuniform Deadlines on Two Processors
- Scheduling UET task systems with concurrency on two parallel identical processors
- Scheduling with deadlines and loss functions
- Shop scheduling problems with multiprocessor tasks on dedicated processors
- The complexity of scheduling independent two-processor tasks on dedicated processors
Cited in
(10)- Scheduling multiprocessor UET tasks of two sizes
- Scheduling multiprocessor tasks -- An overview
- Concurrent operations can be parallelized in scheduling multiprocessor job shop
- Scheduling parallel tasks with sequential heads and tails
- Scheduling multiprocessor tasks for mean flow time criterion
- scientific article; zbMATH DE number 4072695 (Why is no real title available?)
- scientific article; zbMATH DE number 4089308 (Why is no real title available?)
- Scheduling Tree-Structured Tasks on Two Processors to Minimize Schedule Length
- Unknown Input Observers Designed by Eigenstructure Assignment
- Scheduling independent two processor tasks on a uniform duo-processor system
This page was built for publication: Scheduling multiprocessor tasks on two parallel processors
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3148375)