Scheduling optimization of optical lens polishing
From MaRDI portal
Cites work
- A survey of scheduling problems with setup times or costs
- Linear integer programming model as mathematical ware for an optimal flow production planning system at operational scheduling stage
- Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem
- Optimal two- and three-stage production schedules with set-up time included
- Scheduling of a two-stage differentiation flowshop to minimize weighted sum of machine completion times
This page was built for publication: Scheduling optimization of optical lens polishing
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q7267875)