Scheduling problems in master-slave model
From MaRDI portal
Recommendations
- Minimizing mean flowtime and makespan on master-slave systems
- Scheduling master-slave multiprocessor systems
- Complexity of master-slave tasking on heterogeneous trees
- The master-slave paradigm in parallel computer and industrial settings
- Two-machine flow-shop scheduling problems with minimizing the total completion times
Cites work
- A state-of-the-art review of parallel-machine scheduling research
- Approximation techniques for average completion time scheduling
- scientific article; zbMATH DE number 2102785 (Why is no real title available?)
- scientific article; zbMATH DE number 6472636 (Why is no real title available?)
- Letter to the Editor—A Proof of the Optimality of the Shortest Remaining Processing Time Discipline
- Minimizing average completion time in the presence of release dates
- Minimizing makespan in a two-machine flow shop with delays and unit-time operations is NP-hard
- Minimizing makespan in hybrid flowshops
- Minimizing mean flowtime and makespan on master-slave systems
- Scheduling a two-stage hybrid flowshop with separable setup and removal times
- Scheduling algorithms for flexible flowshops: Worst and average case performance
- Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion time
- Scheduling master-slave multiprocessor systems
- Scheduling to Minimize Average Completion Time: Off-Line and On-Line Approximation Algorithms
- Scheduling two-stage hybrid flow shop with availability constraints
- Technical Note—A New Proof of the Optimality of the Shortest Remaining Processing Time Discipline
- The master-slave paradigm in parallel computer and industrial settings
Cited in
(3)
This page was built for publication: Scheduling problems in master-slave model
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q940888)