Simultaneous optimization of classical objectives in JIT scheduling
From MaRDI portal
Recommendations
- Just-in-time scheduling. Models and algorithms for computer and manufacturing systems
- scientific article; zbMATH DE number 1537217
- Minimizing variation of production rates in just-in-time systems: A survey
- Multicriteria models for just-in-time scheduling
- Just-in-time sequencing algorithms for mixed-model production systems
Cites work
- A Computational Analysis Of Balanced Jit Optimization Algorithms
- A bicriterion objective for levelling the schedule of a mixed-model, \(JIT\) assembly process
- A framework for the complexity of high-multiplicity scheduling problems
- Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems
- Level Schedules for Mixed-Model, Just-in-Time Processes
- Minimizing variation of production rates in just-in-time systems: A survey
- Note—Sequencing JIT Mixed-Model Assembly Lines
- On The Relations Between Optimal Solutions For Different Types OfMin-SumBalanced Jit Optimisation Problems
- The maximum deviation just-in-time scheduling problem.
Cited in
(8)- Solving symmetric mixed-model multi-level just-in-time scheduling problems
- scientific article; zbMATH DE number 1537217 (Why is no real title available?)
- The product rate variation problem and its relevance in real world mixed-model assembly lines
- A note on bottleneck product rate variation problem with square-deviation objective
- On The Relations Between Optimal Solutions For Different Types OfMin-SumBalanced Jit Optimisation Problems
- The multi-objective assembly line worker integration and balancing problem of type-2
- Just-in-time scheduling in modern mass production environment
- Multicriteria models for just-in-time scheduling
This page was built for publication: Simultaneous optimization of classical objectives in JIT scheduling
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q879282)