Single machine scheduling with semi-resumable machine availability constraints
From MaRDI portal
Recommendations
- Approximation results for flow shop scheduling problems with machine availability constraints
- Two-machine flowshop scheduling with availability constraints
- Scheduling resumable deteriorating jobs on a single machine with non-availability constraints
- scientific article; zbMATH DE number 6453531
- scientific article; zbMATH DE number 5732726
Cites work
- scientific article; zbMATH DE number 3698707 (Why is no real title available?)
- scientific article; zbMATH DE number 3510069 (Why is no real title available?)
- scientific article; zbMATH DE number 2107164 (Why is no real title available?)
- An efficient fully polynomial approximation scheme for the Subset-Sum problem.
- Exponential inapproximability and FPTAS for scheduling with availability constraints
- Fast Approximation Algorithms for the Knapsack and Sum of Subset Problems
- Fully polynomial approximation schemes for a symmetric quadratic knapsack problem and its scheduling applications
- Machine scheduling with an availability constraint
- Non-preemptive two-machine open shop scheduling with non-availability constraints
- Preemptive scheduling with availability constraints to minimize total weighted completion times
- Scheduling with limited machine availability
- Single machine flow-time scheduling with a single breakdown
- Two simple constant ratio approximation algorithms for minimizing the total weighted completion time on a single machine with a fixed non-availability interval
- Two-machine flowshop scheduling with availability constraints
Cited in
(6)- Single machine scheduling with small operator-non-availability periods
- Single-machine common due date total earliness/tardiness scheduling with machine unavailability
- Single Machine Scheduling with an Availability Constraint and Rejection
- Heuristics for the single machine weighted sum of completion times scheduling problem with periodic maintenance
- A single machine scheduling problem with availability constraints and sequence-dependent setup costs
- A mixed integer linear programming approach to minimize the number of late jobs with and without machine availability constraints
This page was built for publication: Single machine scheduling with semi-resumable machine availability constraints
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q655762)