Single workgroup scheduling problem with variable processing personnel
From MaRDI portal
Recommendations
- Research on flexible personnel scheduling for single task with delivery date as the goal
- Single-machine group scheduling problems with variable job processing times
- A variable neighborhood search algorithm for human resource selection and optimization problem in the home appliance manufacturing industry
- Variable employee productivity in workforce scheduling
- A comparison of mixed-integer linear programming models for workforce scheduling with position-dependent processing times
Cites work
- A hybrid feasibility constraints-guided search to the two-dimensional bin packing problem with due dates
- A New Placement Heuristic for the Orthogonal Stock-Cutting Problem
- A note on minimizing the sum of squares of machine completion times on two identical parallel machines
- A recursive heuristic algorithm for 2D rectangular strip packing problems
- A sequential value correction heuristic for a bi-objective two-dimensional bin-packing
- A single machine scheduling problem with two-dimensional vector packing constraints
- An exact approach to the strip-packing problem
- Bounds for parallel machine scheduling with predefined parts of jobs and setup time
- Computing strong lower and upper bounds for the integrated multiple-depot vehicle and crew scheduling problem with branch-and-price
- Exact algorithms for the guillotine strip cutting/packing problem.
- Exhaustive approaches to 2D rectangular perfect packings
- scientific article; zbMATH DE number 3550186 (Why is no real title available?)
- LP models for bin packing and cutting stock problems
- Models and matheuristics for the unrelated parallel machine scheduling problem with additional resources
- Multidimensional dual-feasible functions and fast lower bounds for the vector packing problem
- The minimum raster set problem and its application to the \(d\)-dimensional orthogonal packing problem
- Tight upper bounds for semi-online scheduling on two uniform machines with known optimum
Cited in
(2)
This page was built for publication: Single workgroup scheduling problem with variable processing personnel
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2173005)