Some Optimum Algorithms for Scheduling Problems with Changeover Costs
From MaRDI portal
Recommendations
- The changeover scheduling problem with time and cost considerations: Analytical results and a forward algorithm
- Algorithms for Solving Production-Scheduling Problems
- A Dynamic Programming Solution to the Dynamic, Multi-Item, Single-Machine Scheduling Problem
- Lot-size scheduling of two types of jobs on identical machines
- Optimal Scheduling of Products with Two Subassemblies on a Single Machine
Cited in
(10)- A forward branch-and-search algorithm and forecast horizon results for the changeover scheduling problem
- A Lagrangean decomposition solution to a single line multiproduct scheduling problem
- A polynomial algorithm for lot-size scheduling of two type tasks.
- Lot-size scheduling of two types of jobs on identical machines
- The changeover scheduling problem with time and cost considerations: Analytical results and a forward algorithm
- Optimal single machine scheduling of products with components and changeover cost
- Scheduling with few changes
- Impact of sequence-dependent setup time on job shop scheduling performance
- Modeling industrial lot sizing problems: a review
- KBSS: A knowledge-based system for scheduling in automated manufacturing
This page was built for publication: Some Optimum Algorithms for Scheduling Problems with Changeover Costs
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3758548)