Pages that link to "Item:Q1081528"
From MaRDI portal
The following pages link to The two-machine sequence dependent flowshop scheduling problem (Q1081528):
Displayed 30 items.
- Green scheduling of a two-machine flowshop: trade-off between makespan and energy consumption (Q320777) (← links)
- Minimizing makespan in a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times (Q342351) (← links)
- Flow shop batching and scheduling with sequence-dependent setup times (Q490328) (← links)
- Two-machine flow shop problems with a single server (Q880567) (← links)
- Search heuristics for a flowshop scheduling problem in a printed circuit board assembly process (Q1278196) (← links)
- Reduction of job-shop problems to flow-shop problems with precedence constraints (Q1296695) (← links)
- Heuristics for the flow line problem with setup costs (Q1303708) (← links)
- An efficient heuristic based on machine workload for the flowshop scheduling problem with setup and removal (Q1339130) (← links)
- Scheduling in a sequence dependent setup environment with genetic search (Q1342322) (← links)
- Two-stage no-wait scheduling models with setup and removal times separated (Q1374028) (← links)
- Computational experience with a branch-and-cut algorithm for flowshop scheduling with setups. (Q1406627) (← links)
- Scheduling a flowline manufacturing cell with sequence dependent family setup times (Q1580980) (← links)
- Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates (Q1630186) (← links)
- A comprehensive review of flowshop group scheduling literature (Q1651625) (← links)
- Enhanced migrating birds optimization algorithm for the permutation flow shop problem with sequence dependent setup times (Q1694317) (← links)
- Solving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristics (Q1776952) (← links)
- Heuristic methods and applications: A categorized survey (Q1823879) (← links)
- Solving the serial batching problem in job shop manufacturing systems (Q1926815) (← links)
- An evolution strategy approach for the distributed permutation flowshop scheduling problem with sequence-dependent setup times (Q2146995) (← links)
- A genetic algorithm for a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times (Q2217032) (← links)
- An iterated greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectives (Q2467260) (← links)
- Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups (Q2565776) (← links)
- Improvement heuristic for the flow-shop scheduling problem: an adaptive-learning approach (Q2572853) (← links)
- A review of TSP based approaches for flowshop scheduling (Q2572854) (← links)
- An approximate solution of the flow-shop problem with sequence dependent setup times (Q3035126) (← links)
- Using simulated annealing to schedule a flowshop manufacturing cell with sequence-dependent family setup times (Q3055422) (← links)
- Permutation and non-permutation schedules for the flowline manufacturing cell with sequence dependent family setups (Q3163328) (← links)
- Uma propriedade estrutural do problema de programação da produção flow shop permutacional com tempos de setup (Q3621499) (← links)
- Flowshop-scheduling problems with makespan criterion: a review (Q5466734) (← links)
- An asymmetric traveling salesman problem based matheuristic algorithm for flowshop group scheduling problem (Q6113360) (← links)