Pages that link to "Item:Q2664376"
From MaRDI portal
The following pages link to Pre-processing a container yard under limited available time (Q2664376):
Displaying 9 items.
- A feature-extraction-based lightweight convolutional and recurrent neural networks adaptive computing model for container terminal liner handling volume forecasting (Q2232683) (← links)
- An efficient and fast local search based heuristic for reel management in a production line of oil extraction pipes (Q2669644) (← links)
- On the integration of the parallel stack loading problem with the block relocation problem (Q2669715) (← links)
- A beam search algorithm for minimizing crane times in premarshalling problems (Q2672129) (← links)
- Optimizing the number of deployed yard cranes in a container terminal (Q5883816) (← links)
- Scheduling ASC and AGV considering direct, buffer, and hybrid modes for transferring containers (Q6065608) (← links)
- A constraint programming approach for the premarshalling problem (Q6106491) (← links)
- The synergistic effect of operational research and big data analytics in greening container terminal operations: a review and future directions (Q6113444) (← links)
- Integer programming model and branch-and-cut algorithm for the stack inbound and pre-marshalling problem (Q6164614) (← links)