Pages that link to "Item:Q2834736"
From MaRDI portal
The following pages link to Optimal two- and three-stage production schedules with setup times included (Q2834736):
Displaying 6 items.
- An exact parallel method for a bi-objective permutation flowshop problem (Q857297) (← links)
- A note on the two machine job shop with the weighted late work criterion (Q880589) (← links)
- A polynomial approximation scheme for problem \(F2/r_ j/C_{\text{max}}\) (Q1376266) (← links)
- The nonpermutation flowshop scheduling problem: adjustment and bounding procedures (Q2336283) (← links)
- Applying tabu search to the job-shop scheduling problem (Q2367003) (← links)
- Local search heuristics for two-stage flow shop problems with secondary criterion (Q5955475) (← links)