The following pages link to (Q4887840):
Displaying 7 items.
- Network-flow based algorithms for scheduling production in multi-processor open-pit mines accounting for metal uncertainty (Q322445) (← links)
- A hybrid method based on linear programming and variable neighborhood descent for scheduling production in open-pit mines (Q887202) (← links)
- LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity (Q958440) (← links)
- A mathematical programming viewpoint for solving the ultimate pit problem (Q1296063) (← links)
- A diversified tabu search approach for the open-pit mine production scheduling problem with metal uncertainty (Q1926975) (← links)
- A strengthened formulation and cutting planes for the open pit mine production scheduling problem (Q2270449) (← links)
- Open pit mine planning with degradation due to stockpiling (Q2289888) (← links)