Pages that link to "Item:Q632670"
From MaRDI portal
The following pages link to A polynomial algorithm for multi-robot 2-cyclic scheduling in a no-wait robotic cell (Q632670):
Displaying 5 items.
- Two-phase branch and bound algorithm for robotic cells rescheduling considering limited disturbance (Q337088) (← links)
- Multi-degree cyclic flow shop robotic cell scheduling problem: ant colony optimization (Q342414) (← links)
- Static force capability optimization of humanoids robots based on modified self-adaptive differential evolution (Q1652338) (← links)
- A dynamic scheduling approach for optimizing the material handling operations in a robotic cell (Q1654361) (← links)
- A survey of scheduling problems with no-wait in process (Q1751258) (← links)