The Two-Machine Maximum Flow Time Problem with Series Parallel Precedence Relations
From MaRDI portal
Cited in
(14)- A two-machine flowshop problem with processing time-dependent buffer constraints-an application in multimedia presentations
- Scheduling Opposing Forests
- The most likely path on series-parallel networks
- Job lateness in a two-machine flowshop with setup times separated
- Sequencing with general precedence constraints
- Reduction of job-shop problems to flow-shop problems with precedence constraints
- Complexity and approximation of open shop scheduling to minimize the makespan: a review of models and approaches
- Non-bottleneck machines in three-machine flow shops
- A decomposition theory based on a dominance relation and composite jobs
- Scheduling of a two-stage differentiation flowshop to minimize weighted sum of machine completion times
- Algorithms for two-machine flow-shop sequencing with precedence constraints
- Minimizing the makespan in a two-machine cross-docking flow shop problem
- The two-machine flow shop problem with arbitrary precedence relations
- A compact labelling scheme for series-parallel graphs
This page was built for publication: The Two-Machine Maximum Flow Time Problem with Series Parallel Precedence Relations
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3863680)