The complexity of two group scheduling problems
From MaRDI portal
Recommendations
- Two-machine shop scheduling problems with batch processing
- Scheduling groups of unit length jobs on two identical parallel machines.
- Group technology approach to the open shop scheduling problem with batch setup times
- Two scheduling problems in group technology with deteriorating jobs
- Minimizing the number of late jobs under the group technology assumption
Cites work
- Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and Complexity
- Minimizing the number of late jobs under the group technology assumption
- Open Shop Scheduling to Minimize Finish Time
- Parallel Machine Scheduling with Batch Setup Times
- Scheduling Groups of Jobs on a Single Machine
- Scheduling with batching: A review
- The complexity of scheduling job families about a common due date
- Two-machine shop scheduling problems with batch processing
Cited in
(16)- Minimizing the number of late jobs under the group technology assumption
- Two-machine group scheduling problem with blocking and anticipatory setups
- Two-machine flowshop group scheduling problem
- Group technology approach to the open shop scheduling problem with batch setup times
- Scheduling groups of unit length jobs on two identical parallel machines.
- An introduction to multi-parameter complexity analysis of discrete problems
- Two-machine shop scheduling problems with batch processing
- Four decades of research on the open-shop scheduling problem to minimize the makespan
- A vibration damping optimization algorithm for a parallel machines scheduling problem with sequence-independent family setup times
- A survey of scheduling problems with setup times or costs
- Group scheduling on two cells with intercell movement
- Two-machine shop scheduling: Compromise between flexibility and makespan value
- Group scheduling in a two-stage flowshop
- scientific article; zbMATH DE number 1877047 (Why is no real title available?)
- Sequential-Merge Facets for Two-Dimensional Group Problems
- Single machine scheduling with assignable due dates to minimize maximum and total late work
This page was built for publication: The complexity of two group scheduling problems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1860372)