The concrete delivery problem
From MaRDI portal
Recommendations
- Analysis, modeling and solution of the concrete delivery problem
- The General Pickup and Delivery Problem
- Integer linear programming models for a cement delivery problem
- The Chinese deliveryman problem
- The delivery man problem with time windows
- The airline container loading problem with pickup and delivery
- The pickup and delivery problem with time windows
- The FedEx problem
- The pickup and delivery problem with cross-docking
Cites work
- scientific article; zbMATH DE number 3639144 (Why is no real title available?)
- A branch-and-price algorithm for parallel machine scheduling with time windows and job priorities
- Analysis, modeling and solution of the concrete delivery problem
- Column Generation
- Genetic algorithms for supply-chain scheduling: a case study in the distribution of ready-mixed concrete
- Hybridization of very large neighborhood search for ready-mixed concrete delivery problems
- Integer linear programming models for a cement delivery problem
Cited in
(12)- Concrete transportation process optimization from the concrete plant to the building site
- Modelling and solving for ready-mixed concrete scheduling problems with time dependence
- Mixed integer programming formulations for the biomass truck scheduling problem
- Hybridization of very large neighborhood search for ready-mixed concrete delivery problems
- Analysis, modeling and solution of the concrete delivery problem
- OR PRACTICE—The Dance of the Thirty-Ton Trucks: Dispatching and Scheduling in a Dynamic Environment
- Towards a decision support system for the ready concrete distribution system: a case of a Greek company.
- Integer linear programming models for a cement delivery problem
- Survey of quantitative methods in construction
- A hybrid of a LP and statistics approach to evaluate a transportation model for a ready concrete company
- Genetic algorithms for supply-chain scheduling: a case study in the distribution of ready-mixed concrete
- Exact algorithms for single-machine scheduling with time windows and precedence constraints
This page was built for publication: The concrete delivery problem