The optimum green split of a cycle time
From MaRDI portal
Recommendations
- Green scheduling, flows and matchings
- Green scheduling, flows and matchings
- The efficiency of cycles of finite period
- Advances in green shop scheduling and optimization
- Finding minimum cost to time ratio cycles with small integral transit times
- The green location-routing problem
- A way to optimally solve a green time-dependent vehicle routing problem with time windows
- Green scheduling of a two-machine flowshop: trade-off between makespan and energy consumption
- The cycle time distribution
- Optimal configuration of a green product supply chain with guaranteed service time and emission constraints
Cited in
(3)
This page was built for publication: The optimum green split of a cycle time
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3690542)